Projects - Underground Structures
Maragua Portal Zone, Kenya


Technical Info
The portal area is located at the foot of the highest and steepest cliff across the project, at the right bank of Maragua river. Cover & Cut methodology with construction of two pile rows on the left and right hand side of the excavation connected by a continuous slab at level +2078.5m followed by underground excavation. Offered Services: Structural Calculations, Detail Design Drawings
-
category:
Underground Structures
-
Date:
2016
-
Client:
SMEC INTERNATIONAL PTY LTD