MARAGUA PORTAL ZONE-KENYA


Technical Info
The portal area is located at the foot of the highest and steepest cliff across the project, at the right bank of Maragua river.
Cover & Cut methodology with construction of two pile rows on the left and right hand side of the excavation connected by a continuous slab at level +2078.5m followed by underground excavation.
Offered Services: Structural Calculations, Detail Design Drawings
-
category:
Underground Structures
-
Date:
2016
-
Client:
SMEC INTERNATIONAL PTY LTD