Projects - Bridges
VALLEY-BRIDGE CROSSING VENETICOS RIVER, SECTION 4.1.3s, EGNATIA ODOS, MACEDONIA PREFECTURE, GREECE


Technical Info
Inspection and Interpretation of Geotechnical Investigations, Final Stage Geotechnical Design of the Bridge Branches 1A (L1A=531m) and 1D (L1D=636m). Branch 1A was designed with 5 Spans (85.6m - 120m) while, branch 1D was designed with 6 Spans (75 – 120m). Foundation of the piers (70m high) was made by shafts and bored piles.
-
category:
Bridges
-
Date:
2005
-
Client:
EGNATIA ODOS S.A./FABERMAUNSEL S.A.